Rig evaluation
Assure has an extensive checklist and experience to verify technical requirements for MODU.
The list consists of more than 1500 check points and is deviated into following main groups:
Overall system
BOP and BOP Control System
Marine system, Anchor handling, Position Keeping
Electrical Systems
Drilling and completion equipment
Maintenance Management
Lifting Equipment, Operations
Health Safety and Environment
DROPS
AoC, Compliance Measurement
Training and Competence
Safety system, ESD, F&G, Communication
Company’s subcontractors equipment
Other requirements such as HPHT/ Deep water/ Winterized operation-equipment and systems, wireline operations
Activities performed prior to the operations
- Rig verifications and Acceptance testing
- Rig Acceptance Process
- Planning of the Rig Acceptance
- Third Party Equipment / Contract
- Review and acceptance of HSE & Technical Capabilities
- Verification & Inspection according to a rig specific plan
- Previous performance and down-time records