Rig Intake and Management

Preparing you for operations

The rig intake process will be based on technical conditions and requirements, including evaluation of management systems, maintenance systems, operational- and organizational requirements, training and competence, and historical performance and conditions, with emphasis on aspects with high risk or influence on Health, Safety, and Environment.

Rig evaluation

Assure has an extensive checklist and experience to verify technical requirements for MODU.

The list consists of more than 1500 check points and is deviated into following main groups:

$

Overall system

$

BOP and BOP Control System

$

Marine system, Anchor handling, Position Keeping

$

Electrical Systems

$

Drilling and completion equipment

$

Maintenance Management

$

Lifting Equipment, Operations

$

Health Safety and Environment

$

DROPS

$

AoC, Compliance Measurement

$

Training and Competence

$

Safety system, ESD, F&G, Communication

$

Company’s subcontractors equipment

$

Other requirements such as HPHT/ Deep water/ Winterized operation-equipment and systems, wireline operations

Activities performed prior to the operations

  • Rig verifications and Acceptance testing
  • Rig Acceptance Process
  • Planning of the Rig Acceptance
  • Third Party Equipment / Contract
  • Review and acceptance of HSE & Technical Capabilities
  • Verification & Inspection according to a rig specific plan
  • Previous performance and down-time records